Manufacturing
Six steps, under 42°C.

01
Hand harvest at dawn
Only the top three leaflets, plucked between 5:00 and 7:00 AM when the sun is soft and the leaves are at peak turgor.
02
Wash & sort
Triple-rinsed in filtered water within one hour of harvest, then sorted by hand to remove stems and damaged leaves.
03
Shade-drying
Spread on woven bamboo trays under solar-heated airflow at under 42°C for 18–24 hours. This is the step most processors skip.
04
Cold-milling
Milled in a low-RPM stone mill to prevent friction heat. The powder never crosses 38°C from leaf to pouch.
05
Batch testing
Every batch is sent to an independent NABL-accredited lab for heavy metals, aflatoxins, microbial and pesticide screening.
06
Sealed & shipped
Nitrogen-flushed, resealable pouches for maximum shelf life. Shipped from our Maharashtra warehouse across India.